Load Shifting
Load shifting from low-cost charging to higher-cost periods
Load shifting stores energy during low-tariff periods (off-peak, solar generation) and discharges during high-tariff periods. This energy arbitrage directly reduces electricity costs without changing consumption patterns.
Get Battery Storage Sizing & Pricing
Find the right BESS for your project.Share a few details for guidance on system sizing, configuration and pricing. No load data needed.
Our team will review your enquiry and follow up by email.
Plan your load shifting system
Share your project and goals. Our team will review your application and follow up about sizing, pricing and the information needed next. No system size or load data needed to start.
01 Tell us your goal
02 Review the options with our team
03 Define the next step
Your selected solutionLoad Shifting
What load shifting delivers
Load shifting for time-of-use tariffs
How load shifting moves energy across the day
-
1Tariff analysis identifies optimal charge/discharge windows
-
2BESS charges during lowest-cost periods
-
3Stored energy is discharged during peak tariff periods
-
4Solar generation is stored for evening consumption
-
5AI optimisation maximises savings automatically
Typical configuration envelope
Load shifting is an energy-driven application, sized around the magnitude and duration of the daily off-peak / on-peak price spread.
| Parameter | Typical Range |
|---|---|
|
Capacity
|
200 – 2,000 kWh |
|
Power
|
100 – 500 kW |
|
Charge Window
Typically 22:00–06:00
|
Off-peak |
|
Discharge Window
07:00–10:00 · 18:00–21:00
|
Peak |
Load Shifting – Deployment Case Study
A commercial complex with a 150 kW solar array was exporting 60% of generation due to midday low-demand periods, while paying peak rates in the evening.
A 400 kWh BESS captures midday solar surplus and discharges during the 18:00–21:00 peak tariff window.
- Solar self-consumption increased from 40% to 92%
- Annual electricity cost reduced by R280,000
- Carbon emissions reduced by 45 tonnes / year

Plan your load shifting schedule
Start with the tariff periods, site demand and available charging capacity. Then compare the value of shifting energy with conversion losses and the planned duty cycle. Load shifting needs a feasible recharge window as well as enough stored energy to cover the target period.
Compare BX commercial battery systems or discuss your site requirements. For background, see the U.S. Department of Energy’s energy storage research and resources.